Measured on meters, tested A/B, audited monthly. Including a live deployment right here in Bangkok.
An 88-room luxury hotel in central Bangkok, next to Erawan Shrine — running two incompatible worlds at once: 62 rooms on a chilled-water plant (3 Trane chillers, 6 chilled / 6 condenser water pumps, 3 cooling towers) and 26 rooms on Daikin VRV, with no BMS, no centralized control, and pumps stuck at fixed speed.
Element AI was layered on non-invasively: window sensors, temperature and occupancy sensors in guestrooms, a VRF central-control module for the Daikin side, VFD control for the pump sets, and an AI energy controller tying it all together.
Guestroom AC automation cut per-room energy from 560 to 446 units/month, plus a "housekeeping assistant" that flags truly empty rooms.
Large commercial complex; measurable reduction in common-area and plant consumption with an improved green profile.
Fine-grained energy control under dense footfall; four-domain deployment (lighting, HVAC, parking, elevators).
Precision cooling under high-density thermal load — savings without touching IT availability.
Heavy-industry, high-consumption environment optimized for auxiliary energy use.
Pumps, compressed air and process equipment matched to real production demand.
Restaurant equipment is largely fixed-speed — which makes the savings fast and easy to verify with a two-week A/B test.
| Chain | Systems controlled | Saving | Annual value per store |
|---|---|---|---|
| Famous hotpot chain | Lighting, exhaust, induction, AC | 25% | ~THB 2.7M |
| Well-known Chinese restaurant | Lighting, exhaust | 50% | ~THB 175,000 |
| Boutique coffee shop | Lighting, exhaust, grinders | 15–20% | ~THB 145,000 |
| Trendy bakery | Lighting, ovens, proofer, exhaust, AC | 28% | ~THB 110,000 |
| Chinese fine dining | Exhaust | 15–20% | ~THB 260,000 |
| HK-style tea restaurant | Exhaust, AC | 33% → 53% | grew with self-evolution in 3 months |
Values converted from source-case RMB figures at a reference rate (1 CNY ≈ 4.9 THB); actual results vary by site, tariff and operating hours.
4.5M kWh/year property; AI chiller-plant control delivered a five-million-baht-class annual saving with zero guest-facing change.
5M kWh/year property; chiller, pump and tower coordination cut summer cooling costs by ~THB 150,000 per month.
HVAC, ventilation, lighting and plug loads across every campus — ~THB 21,000 saved per campus per month.
Every number on this page started with one free survey and one two-week A/B test. Start yours.